6. Install record and pre-drive checklist#
Authority for this chapter: it does not introduce anything new — every line below is copied from the "You are done when…" section at the end of chapters 1 through 5. This chapter exists to put the whole visit on one printable page: a single tick-box checklist, and a fill-in record of what you actually did. Print it (or save it as a PDF) before you leave the office, and bring it back filled in.
The whole visit, as one checklist#
Chapter 1 — Before you go#
- You have the
.zippackage and its.sha256.txtfingerprint file, and Check 1 passed. - You have the filled-in settings template for this specific laptop, with no blank fields.
- You have confirmed the plant's laptop, network, and administrator access will be ready when you arrive.
- You have a working phone number for the rollback contact.
Chapter 2 — Installing Ring#
-
C:\Ring\App\Ring.exeexists, withx64\SQLite.Interop.dllpresent. -
Config\appsettings.local.jsonexists, has this plant's real values — including a real PLC address (not127.0.0.1) and two unique passwords that are neither blank nor placeholders — and passed theConvertFrom-Jsoncheck with no error. - The Ringwood HMI shortcut exists on the desktop and in the Start menu.
- If — and only if — the plant is ready to run unattended: the watchdog restart test actually brought Ring back after you ended its task.
Chapter 3 — First start#
- The wizard's final page has been completed and Ring has opened its normal main screen (not the wizard, not a warning dialog).
- You are certain the read-only safety page was left on "keep read-only mode on."
- The PLC address on page 4 is the real plant controller address, not the
127.0.0.1placeholder. - You know which optional pages (email, recipients, defaults, plant names, shifts) you skipped, so you can tell the plant what still needs finishing.
Chapter 4 — Checking your work#
- Checks 1 through 12 all passed (or Check 4's network reachability is explicitly recorded as deferred below).
- You know, and have written down, anything that didn't pass and what you did about it (or who you called).
- The person taking over for operator training has what they need from chapter 4's "Leave-behind notes."
Chapter 5 — When something goes wrong (only if something did)#
- You correctly identified whether you were in situation A (your own unfinished visit) or situation B (an already-live plant) before doing anything.
- Either the problem is fixed and Checks 1-12 in chapter 4 all pass, or you've rolled back cleanly and sent engineering the evidence they need.
Install record#
Fill in the right-hand column as you go. Take a photo of the completed page before you leave, in addition to leaving the paper copy with your handoff notes.
| Field | Value |
|---|---|
| Plant / customer name | |
| Station / LCP name | |
| Date of visit | |
| Installer name | |
| Ring version (from the splash screen — watch for it as Ring starts) | |
| Controller IP address used | |
| Controller path (port, slot) used | |
| Read-only mode confirmed ON at handoff? (Y/N) | |
| Wizard pages skipped (list page numbers) | |
| Network / PLC reachable at handoff? (Y / deferred — see chapter 3) | |
| Plant profile exported to (filename) | |
| Manuals library installed? (Y/N) | |
| Watchdog / unattended-restart configured? (Y/N/not yet) | |
| Operators trained by / date | |
| Handover accepted by (plant contact, name) | |
| Anything left unfinished, and who owns finishing it |
Next: back to the chapter list, or — if you're not done — whichever chapter you left off on.